THE DESIGN OF THE DS 014


COMBINED POURING OIL ON 3 TYPES OF FUEL

The loading island is designed for upper and lower sealed release of light oil products in tankers of different capacity.

Measurement of the released oil product occurs by a direct method taking into account on weight.

Filling of oil products is carried out by metering units through the console of the upper and lower hermetic filling.

The island has 2 loading fronts, loading of oil products from one front is possible from the 1st or from 3 metering stations at the same time with a total capacity of 90 to 270 m3/h.

When loading from 2 fronts, 1-3 metering units are used on each filling front, depending on the number of metering units involved, it is involved on the opposite loading front, with the total volume of the released oil product from each loading front will be from 90 m3/h to 270 m3 / h

Request a call

Name*
Phone*
Request a call